{"id":49142,"date":"2026-04-17T19:06:56","date_gmt":"2026-04-17T13:36:56","guid":{"rendered":"https:\/\/dailynewsindia.co.in\/index.php\/2026\/04\/17\/jabraj-singh-on-building-high-capacity-power-transmission-networks-for-solar-evacuation-across-indias-renewable-corridors\/"},"modified":"2026-04-17T19:06:56","modified_gmt":"2026-04-17T13:36:56","slug":"jabraj-singh-on-building-high-capacity-power-transmission-networks-for-solar-evacuation-across-indias-renewable-corridors","status":"publish","type":"post","link":"https:\/\/dailynewsindia.co.in\/index.php\/2026\/04\/17\/jabraj-singh-on-building-high-capacity-power-transmission-networks-for-solar-evacuation-across-indias-renewable-corridors\/","title":{"rendered":"Jabraj Singh on Building High-Capacity Power Transmission Networks for Solar Evacuation Across India\u2019s Renewable Corridors"},"content":{"rendered":"<div>\n<p><strong>New Delhi [India], April 17:<\/strong> India\u2019s renewable energy journey is entering a decisive phase, where the focus is no longer limited to adding solar capacity but ensuring that clean energy reaches demand centers efficiently. As solar parks expand across regions such as Rajasthan, Gujarat, and\u00a0Ladakh, the need for high-capacity power transmission networks has become increasingly critical.\u00a0Jabraj\u00a0Singh, a veteran in the field of power\u00a0transmission, highlights that building strong solar\u00a0evacuation infrastructure will determine how effectively India can harness its renewable potential. With India targeting 500 GW of non-fossil fuel capacity by 2030, transmission systems are emerging as the backbone of the country\u2019s clean energy ambitions.<\/p>\n<p>\u201cIndia\u2019s renewable energy growth is no longer constrained by generation capacity alone. The real challenge lies in building high-capacity transmission networks that can evacuate solar power from remote renewable corridors to major demand centers. Without strong evacuation infrastructure, even the largest solar parks cannot deliver their full potential to the grid,\u201d says\u00a0<a href=\"https:\/\/leaderbiography.com\/jabraj-singh\/\" target=\"_blank\" rel=\"noopener\"><u>Jabraj<\/u><u>\u00a0Singh, the expert<\/u><\/a>.<\/p>\n<p>India has rapidly scaled solar installations in recent years, particularly in states such as Rajasthan and Gujarat, which offer vast land availability and high solar irradiance. Rajasthan\u2019s\u00a0Bhadla\u00a0Solar Park, one of the world\u2019s largest solar hubs, has become a symbol of India\u2019s renewable ambitions. Similarly, Gujarat\u2019s solar expansion in regions like Kutch and\u00a0Dholera\u00a0continues to strengthen India\u2019s renewable capacity.\u00a0Ladakh\u00a0is also emerging as a key renewable energy hub, with large-scale solar projects planned to supply clean energy to northern demand centers. However, these generation hubs are often located far from consumption centers such as Delhi, Mumbai, and industrial clusters in northern and western India, making transmission infrastructure crucial.<\/p>\n<p>India is aggressively expanding its transmission network to support this shift. According to the Central Electricity Authority\u2019s transmission planning for 500 GW of non-fossil capacity, India\u2019s transmission network is expected to expand to nearly 6.48 lakh circuit kilometers by 2032. Transformer capacity is also projected to grow significantly to support renewable integration. These upgrades are designed to enable seamless evacuation of solar power from renewable-rich regions and strengthen grid stability.<\/p>\n<p>Major\u00a0green\u00a0transmission\u00a0corridors are already being developed to address this need. Recently, power transmission projects worth \u20b93,600 crore were inaugurated in Rajasthan to support renewable energy evacuation. These projects are designed to handle up to 20 GW of renewable capacity, significantly enhancing India\u2019s ability to transport solar power from generation zones to load centers. Such initiatives are part of a broader strategy to develop dedicated renewable energy corridors that reduce congestion and improve grid reliability.<\/p>\n<p>Another significant development is the \u00b1800 kV HVDC transmission corridor linking\u00a0Bhadla\u00a0in Rajasthan to\u00a0Fatehpur\u00a0in Uttar Pradesh. This 950-kilometre transmission project is designed to evacuate 6,000 MW of renewable energy, enabling solar\u00a0power generated in remote desert regions to reach densely populated industrial and urban centers. High-capacity HVDC technology is increasingly being adopted in India to manage long-distance power transfer efficiently while minimizing transmission losses.<\/p>\n<p><a href=\"https:\/\/www.crunchbase.com\/person\/jabraj-singh\" target=\"_blank\" rel=\"noopener\"><u>Jabraj<\/u><u>\u00a0Singh notes<\/u><\/a>\u00a0that high-voltage transmission lines and advanced grid technologies are essential for managing the variability of solar energy. \u201cSolar generation is inherently variable, which makes grid modernization and flexible transmission systems extremely important. High-voltage corridors and digital grid management solutions help ensure reliable power delivery even as renewable penetration increases,\u201d he explains.<\/p>\n<p>Green Energy Corridor projects are also playing a major role in strengthening India\u2019s renewable infrastructure. The first phase of the Green Energy Corridor has already been completed, while the second phase focuses on integrating around\u00a020 GW of renewable energy from solar-rich states such as Rajasthan, Gujarat, and Tamil Nadu. These projects include high-capacity substations, transmission lines, and renewable energy management centers designed to handle fluctuations in solar generation.<\/p>\n<p>Despite strong progress, challenges remain. Land acquisition and right-of-way issues continue to slow transmission projects, particularly in remote and densely populated regions. Multi-agency approvals and equipment procurement delays also impact timelines. However, ongoing policy reforms and increased investment, estimated at over \u20b92.4 lakh crore for transmission infrastructure, are expected to accelerate deployment in the coming years.<\/p>\n<p>Jabraj\u00a0Singh believes that strengthening solar evacuation infrastructure will be critical for long-term energy security. \u201cTransmission infrastructure is the bridge between renewable potential and actual energy delivery. Investing in high-capacity transmission today will ensure India\u2019s renewable energy goals translate into reliable power for industries, cities, and rural communities alike,\u201d he adds.<\/p>\n<p>As India accelerates toward its renewable energy targets, high-capacity transmission networks will play a defining role in shaping the country\u2019s clean energy future. From green energy corridors and HVDC links to smart grid modernization, the focus is shifting toward building a resilient and flexible power transmission backbone. With leaders like\u00a0Jabraj\u00a0Singh emphasizing the importance of solar evacuation infrastructure, India\u2019s renewable corridors are set to evolve into powerful engines of sustainable growth, grid reliability, and long-term energy security.<\/p>\n<p><em>If you object to the content of this press release, please notify us at pr.error.rectification@gmail.com. We will respond and rectify the situation within 24 hours.<\/em><\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>New Delhi [India], April 17: India\u2019s renewable energy journey is entering a decisive phase, where the focus is no longer limited to adding solar capacity but ensuring that clean energy reaches demand centers efficiently. As solar parks expand across regions such as Rajasthan, Gujarat, and\u00a0Ladakh, the need for high-capacity power transmission networks has become increasingly&#8230;<\/p>\n<p class=\"more-link-wrap\"><a href=\"https:\/\/dailynewsindia.co.in\/index.php\/2026\/04\/17\/jabraj-singh-on-building-high-capacity-power-transmission-networks-for-solar-evacuation-across-indias-renewable-corridors\/\" class=\"more-link\">Read More<span class=\"screen-reader-text\"> &ldquo;Jabraj Singh on Building High-Capacity Power Transmission Networks for Solar Evacuation Across India\u2019s Renewable Corridors&rdquo;<\/span> &raquo;<\/a><\/p>\n","protected":false},"author":1,"featured_media":49143,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[634],"class_list":["post-49142","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-lifestyle","tag-lifestyle"],"_links":{"self":[{"href":"https:\/\/dailynewsindia.co.in\/index.php\/wp-json\/wp\/v2\/posts\/49142","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dailynewsindia.co.in\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dailynewsindia.co.in\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dailynewsindia.co.in\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dailynewsindia.co.in\/index.php\/wp-json\/wp\/v2\/comments?post=49142"}],"version-history":[{"count":0,"href":"https:\/\/dailynewsindia.co.in\/index.php\/wp-json\/wp\/v2\/posts\/49142\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dailynewsindia.co.in\/index.php\/wp-json\/wp\/v2\/media\/49143"}],"wp:attachment":[{"href":"https:\/\/dailynewsindia.co.in\/index.php\/wp-json\/wp\/v2\/media?parent=49142"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dailynewsindia.co.in\/index.php\/wp-json\/wp\/v2\/categories?post=49142"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dailynewsindia.co.in\/index.php\/wp-json\/wp\/v2\/tags?post=49142"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}